Guides and forms for every step of a nobilia kitchen

For dealers and installers
What it is

A short guide for each stage of a nobilia project, from measuring the room to the final walkthrough, and a form for most of them. Written for dealers and installers and their customers. These are optional tools, not requirements. Use the ones that help you run a cleaner job.

How to use it

Read a step’s guide once. Use its form on the job: fill it in on screen, print it, or download a fillable PDF. Rebrand or adapt any of it. Every job is different, so use the steps that apply.

If you use only two steps, use the first two: measure the space and sign off on the design. They catch most install-day problems before anything is ordered.

Who to call

Questions at any step go to customersupport@nobilia-america.com. A person answers, and every email becomes a ticket with a named owner.

Damaged, missing, or wrong part? Report it →

The steps

Open a step for what happens and what the customer does

Listed in the order most projects run. Not every job needs every step, so use what helps on yours.

WhoInstaller, ideally the one who will install the jobWhenBefore anything is designed or ordered
What happens

Every wall, opening, ceiling height, and utility centerline goes on one sheet, with a drawing and photos. The design starts from these numbers. Whenever possible, the person who measures is the person who installs.

The customer’s part

Clear space to reach the walls, and point out anything they know about the room: uneven walls, hidden outlets.

Why it matters

A wrong measurement means a remade cabinet and weeks of delay. Measuring correctly once prevents both.

WhoInstaller signs, designer acknowledges, customer approvesWhenAfter measurements are verified, before the order
What happens

The installer checks the design against the room (dimensions, ceiling heights, utilities, appliance sizes, clearances, door swings) and signs that it will install as drawn. Then the customer approves the final design.

The customer’s part

Review the drawings carefully, ask their questions now, and sign when it’s right.

Why it matters

What arrives is exactly what was approved. No surprises after the order is placed.

Order placedFrom here the order can’t be changed.
WhoAnyone holding the order paperworkWhenOnce the order is placed
What happens

The order has one order number (ACK#), and every cabinet, panel, and part has a position number (POS#). Both are on the paperwork and on a white sticker on each piece. Klassik and Studio paperwork read differently; the guides cover both.

The customer’s part

Keep the order packet. They’ll want it at delivery.

Why it matters

Any question about any part, missing, damaged, or misplaced, is answered by its numbers.

WhoInstallerWhen1–2 days before install
What happens

The installer walks the site: blocking in the walls, flooring in, power on, appliances on site. The walk ends with one answer. “Not yet” moves the date before a crew travels.

The customer’s part

Be reachable that day, have appliance details and site access ready, and say early if anything is behind schedule.

Why it matters

A crew only travels to a site that’s ready. Nobody pays for a wasted install day.

WhoWhoever receives the delivery, 18+WhenDelivery day, at the truck
Visible damage? Note it on the driver’s paperwork, then report it to nobilia within 7 days →
What happens

The driver calls ahead; most windows are about four hours. Before signing, pallets and boxes are counted against the delivery note. Visible damage goes on the driver’s paperwork and is photographed before the truck leaves.

The customer’s part

Pick a dry landing spot, clear the path, and count everything before signing. About ten minutes.

Why it matters

The driver’s paperwork is the record with the carrier. This is a quick outside check; the full inspection is the next step.

WhoInstaller, or the customerWhenWithin days of delivery
Found a problem? Send one report with everything, within 7 days of delivery →
What happens

Every box is checked against the delivery note: read the label, tick the label, find the line, tick the line. Small parts often ship inside cabinets, and this is where they turn up.

The customer’s part

If they do the check: unwrap, inspect, re-wrap. Panels stay in their plastic.

Why it matters

A problem found now has its replacement moving before install day. The crew is booked once the kitchen is complete.

WhoInstall crewWhenBefore the first cabinet goes up
What happens

The crew sorts boxes into four groups (tall, base, wall, panels), labels facing out, staged by room and checked against the drawings. About thirty minutes.

The customer’s part

Nothing needed at this step.

Why it matters

Crew hours go into installing, and anything missing shows up before it costs a day.

WhoCrew lead, with the customerWhenInstall day 1, before work starts
What happens

The crew confirms the install guide is current, checks the flooring and the inventory, verifies each appliance against the plan, and photographs the site as it stands.

The customer’s part

Walk the plan once with the crew lead and confirm the site’s condition together.

Why it matters

Work starts from a baseline both sides agreed on. No disputes later about prior conditions.

WhoInstaller and customer, togetherWhenThe moment the plan changes on site
What happens

When the site forces a change (a pipe, a beam, a wall that isn’t square), it’s written down: what changes, why, and what was agreed instead. Both sign. The form never includes pricing.

The customer’s part

Agree changes in writing, not verbally. It takes two minutes and two signatures.

Why it matters

Every on-site decision is on record, so nobody disagrees later about what was decided.

WhoInstaller and customer, togetherWhenInstall complete
What happens

Every door opened, every drawer run, every appliance checked in its opening, photos taken. Anything unfinished gets a name, a plan, and a date. Then both sign.

The customer’s part

Take their time, ask how to care for the finishes, and sign once they’ve seen everything work.

Why it matters

The job ends checked, photographed, and signed, instead of discovered piece by piece after the crew leaves.

Any time from delivery

Report an issue

Report damaged, missing, or wrong parts the day you find them, whether that’s at the truck, at check-off, or on site. A replacement can only be ordered once the report is in, so the earlier it comes, the sooner the part arrives.

Every report needs
1The ACK# and POS#, from the delivery note or the white sticker
2A photo of the issue
3A photo of the white sticker, which identifies the exact part

Damage must be reported within 7 days of delivery. Everything goes in one email to customersupport@nobilia-america.com.