Guides and forms for every step of a nobilia kitchen
For dealers and installersA short guide for each stage of a nobilia project, from measuring the room to the final walkthrough, and a form for most of them. Written for dealers and installers and their customers. These are optional tools, not requirements. Use the ones that help you run a cleaner job.
Read a step’s guide once. Use its form on the job: fill it in on screen, print it, or download a fillable PDF. Rebrand or adapt any of it. Every job is different, so use the steps that apply.
If you use only two steps, use the first two: measure the space and sign off on the design. They catch most install-day problems before anything is ordered.
Questions at any step go to customersupport@nobilia-america.com. A person answers, and every email becomes a ticket with a named owner.
Damaged, missing, or wrong part? Report it →The project at a glance
Select a step to jump to itThe steps
Open a step for what happens and what the customer doesListed in the order most projects run. Not every job needs every step, so use what helps on yours.
Every wall, opening, ceiling height, and utility centerline goes on one sheet, with a drawing and photos. The design starts from these numbers. Whenever possible, the person who measures is the person who installs.
Clear space to reach the walls, and point out anything they know about the room: uneven walls, hidden outlets.
A wrong measurement means a remade cabinet and weeks of delay. Measuring correctly once prevents both.
The installer checks the design against the room (dimensions, ceiling heights, utilities, appliance sizes, clearances, door swings) and signs that it will install as drawn. Then the customer approves the final design.
Review the drawings carefully, ask their questions now, and sign when it’s right.
What arrives is exactly what was approved. No surprises after the order is placed.
The order has one order number (ACK#), and every cabinet, panel, and part has a position number (POS#). Both are on the paperwork and on a white sticker on each piece. Klassik and Studio paperwork read differently; the guides cover both.
Keep the order packet. They’ll want it at delivery.
Any question about any part, missing, damaged, or misplaced, is answered by its numbers.
The installer walks the site: blocking in the walls, flooring in, power on, appliances on site. The walk ends with one answer. “Not yet” moves the date before a crew travels.
Be reachable that day, have appliance details and site access ready, and say early if anything is behind schedule.
A crew only travels to a site that’s ready. Nobody pays for a wasted install day.
The driver calls ahead; most windows are about four hours. Before signing, pallets and boxes are counted against the delivery note. Visible damage goes on the driver’s paperwork and is photographed before the truck leaves.
Pick a dry landing spot, clear the path, and count everything before signing. About ten minutes.
The driver’s paperwork is the record with the carrier. This is a quick outside check; the full inspection is the next step.
Every box is checked against the delivery note: read the label, tick the label, find the line, tick the line. Small parts often ship inside cabinets, and this is where they turn up.
If they do the check: unwrap, inspect, re-wrap. Panels stay in their plastic.
A problem found now has its replacement moving before install day. The crew is booked once the kitchen is complete.
The crew sorts boxes into four groups (tall, base, wall, panels), labels facing out, staged by room and checked against the drawings. About thirty minutes.
Nothing needed at this step.
Crew hours go into installing, and anything missing shows up before it costs a day.
The crew confirms the install guide is current, checks the flooring and the inventory, verifies each appliance against the plan, and photographs the site as it stands.
Walk the plan once with the crew lead and confirm the site’s condition together.
Work starts from a baseline both sides agreed on. No disputes later about prior conditions.
When the site forces a change (a pipe, a beam, a wall that isn’t square), it’s written down: what changes, why, and what was agreed instead. Both sign. The form never includes pricing.
Agree changes in writing, not verbally. It takes two minutes and two signatures.
Every on-site decision is on record, so nobody disagrees later about what was decided.
Every door opened, every drawer run, every appliance checked in its opening, photos taken. Anything unfinished gets a name, a plan, and a date. Then both sign.
Take their time, ask how to care for the finishes, and sign once they’ve seen everything work.
The job ends checked, photographed, and signed, instead of discovered piece by piece after the crew leaves.
Report an issue
Report damaged, missing, or wrong parts the day you find them, whether that’s at the truck, at check-off, or on site. A replacement can only be ordered once the report is in, so the earlier it comes, the sooner the part arrives.
Damage must be reported within 7 days of delivery. Everything goes in one email to customersupport@nobilia-america.com.