Renovation Toolkit · Form 06

Check Off Every Box

Turn the pile of boxes into a confirmed inventory. Work from the delivery note — it is the master list. Read the label, tick the label, find the line, tick the note. Every box. Every line.

1PROJECT
2THE CHECK

Some lines have no box — that is normal. Handles and toe kick ship bulk-packed or inside cabinets. Small parts come in small bags. Look inside cabinets first.

3PROBLEMS FOUNDphotograph each issue 2 ways: the damage, and the white sticker
ACK#POS#What's wrongDamage photoSticker photo
4THE REPORT
Open the Report an Issue form →
Signature
Date

Good to know: some things only show up mid-install — a mark on a door front, a few missing screws. Report them when found; most do not delay the job.

Form 06 · Check Off Every BoxWe're here to help · customersupport@nobilia-america.com
This resource is optional and provided for general guidance only. It reflects suggestions based on industry standards. No information is collected or stored through this document, and no responsibility is assumed for its use. All work should be performed by qualified professionals and verified against project-specific documents and site conditions.