Record the Change

Kitchens meet real walls, and sometimes the plan changes on site. Record what changed, why, and who agreed. This form intentionally does not address pricing — commercial terms stay between the customer and their contract.

1PROJECT
2THE CHANGEone row per change · reference the plan by position / area
ACK#POS#What is changing (position / area)WhyAgreed result
3SIGN-OFF

Both signatures keep everyone agreeing later about what was decided.

Customer signature
Date
Installer signature
Date
Form 09 · Record the ChangeWe're here to help · customersupport@nobilia-america.com
This resource is optional and provided for general guidance only. It reflects suggestions based on industry standards. No information is collected or stored through this document, and no responsibility is assumed for its use. All work should be performed by qualified professionals and verified against project-specific documents and site conditions.