The Final Walkthrough

End the project with confidence: everything opened, everything checked, everything photographed — together. Most contractors never do this walk. This one closes the job with pride, on record.

Even gaps are the mark of a finished job

Purpose
The project ends on record — checked, documented, and signed by both sides.
When
Install complete.
Who
Installer and customer together.
The work
1
Walk it together
Every cabinet, panel, filler, trim, toe kick. Installed and looking right.
2
Open everything
Every door, drawer, pullout. Smooth, aligned, quiet.
2b
Check appliance spaces
Every appliance fits its opening — gaps right, doors clear. The classic post-install surprise, caught here.
3
Check the reveals
Even gaps are the mark of a finished job.
4
Record what changed
Any on-site changes to the design. What, why, and the result.
5
Photograph the finish
The rooms. The details. Anything that changed. Final photos are the record — and send a few finished photos to the nobilia team; we’d love to see it. (wording TBD)
6
Sign together
Customer confirms. Installer confirms.
The gateNobody leaves without a signed walkthrough.
Handoff
The signed sheet and final photos join the job record. Anything unfinished gets a name, a reason, and a follow-up plan.
Escalate
Anything that can't be resolved in the room: report it — ACK#, POS#, photos — through Report an Issue.
This resource is optional and provided for general guidance only. It reflects suggestions based on industry standards. No information is collected or stored through this document, and no responsibility is assumed for its use. All work should be performed by qualified professionals and verified against project-specific documents and site conditions.