Renovation Toolkit · Guide 07

Stage the Install

Crews lose more time hunting boxes than hanging cabinets. Staging puts every piece where the crew expects it — and missing pieces show themselves before they cost a day.

30 minutes, before the first cabinet goes up

Purpose
Job staged so install day is install, not sorting.
When
Before the first cabinet goes up.
Who
The install crew.
The work
1
Sort into 4 groups
Tall cabinets. Base cabinets. Wall cabinets. Panels and fillers.
2
Labels face out
Every label readable without moving a box. Keep stacks short.
3
Stage by room
Each box goes in — or next to — the room where it will live.
4
Match numbers to drawings
Studio: POS numbers on the elevations. Klassik: product names on the parts list. Tick each piece as you place it. Inventory from the elevations or parts list — not the floor plan.
5
Lay small parts on a table
Grouped by type. Visible parts don’t get lost.
The gateStage first. Open boxes second — you need the labels to stage.
Handoff
Staged and ticked — the crew starts. Before the First Screw is next.
Escalate
Something looks missing? Plinth may be bundled with ceiling fillers and panels — check before calling it missing. Multi-order jobs: the 4-digit code = last 2 of the order number + POS. Then report with ACK# + POS# + photos.
This resource is optional and provided for general guidance only. It reflects suggestions based on industry standards. No information is collected or stored through this document, and no responsibility is assumed for its use. All work should be performed by qualified professionals and verified against project-specific documents and site conditions.