Your project guide
Your kitchen, step by step

Every step has a guide, a form, and someone responsible for it.

Most of the checking happens before anything is ordered. Here is each step: what happens, what you do, and why it matters.

Tap a step to read it

The steps, in plain words

Every button opens the live guide or form — “← Journey map” brings you back
STEP 01

Measure Your Space

Your installer

Your cabinets are built to these numbers.

What happens

Every wall, window, door, and utility line is measured and photographed, on one sheet. Whenever possible, the measurements are taken by the same person who will install your kitchen.

What you do
  • Clear enough space to reach the walls
  • Point out anything you know about the room — uneven walls, hidden outlets
Why it matters

A wrong measurement means a re-made cabinet and weeks of delay. Measuring correctly once prevents both.

STEP 02

Sign Off on the Design

You + installer + designer

Confirmed to fit — before the order is placed.

What happens

The installer checks the design against your room — ceiling heights, utilities, appliance sizes, door swings — and signs that it will install as drawn. Then you approve the final design.

What you do
  • Review the drawings carefully
  • Ask your questions now — once an order is placed, it cannot be changed
  • Sign when it's right
Why it matters

What arrives is exactly what you approved. No surprises after the order is placed.

STEP 03

Know Your Order

Your project team

Every piece has a number.

What happens

Your order has one order number (ACK#), and every cabinet, panel, and part has a position number (POS#). Both are printed on the paperwork and on a white sticker on each piece. Together they identify any part exactly.

What you do
  • Keep your order packet — you'll want it at delivery
  • Your project team handles the rest
Why it matters

Any question about any part — missing, damaged, misplaced — is answered by its numbers, immediately.

STEP 04

Get the Site Ready

Your installer

One honest answer: ready — or not yet.

What happens

One to two days before install, your installer walks the site and checks: blocking in the walls, flooring in, power on, appliances on site. The walk ends with one answer — ready, or not yet. "Not yet" moves the date before a crew travels, not after.

What you do
  • Be reachable that day
  • Have appliance details and site access ready
  • If something is behind schedule, say so early
Why it matters

A crew only travels to a site that's ready. You never pay for a wasted install day.

STEP 05

Receive Your Cabinets

Whoever receives it — 18+

Count before you sign.

What happens

The driver calls ahead; most delivery windows are about four hours. Boxes go to the first dry space — a garage works well. Before signing, pallets and boxes are counted against the delivery note. Any damage is written on the driver's paperwork and photographed before the truck leaves.

What you do
  • Pick the landing spot and clear a path
  • Count everything against the delivery note before you sign — about ten minutes
  • Note anything unexpected on the driver's paperwork and photograph it
Why it matters

Inspecting your delivery at the truck means anything is caught early — and resolved before install day.

STEP 06

Check Off Every Box

Your installer — or you

Every box. Every line. Before the crew is booked.

What happens

Within days of delivery, every box is checked against the delivery note: read the label, tick the label, find the line, tick the line. Small parts often ship inside cabinets — this check finds them now, not on install morning.

What you do
  • Unwrap, inspect, re-wrap — don't fully unbox
  • Leave panels in their plastic
  • Report anything missing or damaged in one email — Step 11
Why it matters

A problem found today has its replacement moving before install day. The crew is booked only when the kitchen is complete.

STEP 07

Stage the Install

The install crew

Every piece where the crew expects it.

What happens

Before the first cabinet goes up, the crew sorts the boxes into four groups — tall, base, wall, panels — labels facing out, staged by room, checked against the drawings. About thirty minutes.

What you do
  • Nothing is needed from you at this step
Why it matters

Crew hours go into installation, not searching — and anything missing is found before it costs a day.

STEP 08

Before the First Screw

Crew lead + you

No guide, no start.

What happens

Day one, before work begins: the crew confirms the install guide is current, checks the flooring, confirms the inventory, verifies each appliance against the plan, and photographs the site as it stands.

What you do
  • Walk the plan once with the crew lead
  • Confirm the site's condition together
Why it matters

Work starts from a documented baseline both sides agreed on. No disputes later about prior conditions.

STEP 09

Record the Change

You + installer, together

Changes are written and signed before work continues.

What happens

Sometimes the site forces a change — a pipe, a beam, a wall that isn't square. The change is recorded: what is changing, why, and what was agreed instead. Both of you sign before the work continues. This form never includes pricing — it's a record, not a bill.

What you do
  • Don't approve changes verbally
  • Two minutes to write it, two signatures
Why it matters

Every on-site decision is documented with both signatures. No disagreements later about what was decided.

STEP 10

The Final Walkthrough

You + installer, together

Open everything. Check everything. Together.

What happens

The project ends with a full walkthrough, together: every door opened, every drawer run, every appliance checked in its opening, photos taken. Anything unfinished is named, with a plan and a date. Then you both sign.

What you do
  • Take your time
  • Ask how to care for the finishes
  • Sign when you've seen everything work
Why it matters

The project ends checked, photographed, and signed — not discovered piece by piece after the crew leaves.

STEP 11

Report an Issue

You, your installer, or your dealer

Photograph the white sticker. It identifies your exact part.

What happens

If anything is damaged, missing, or wrong, one complete email starts the fix: what happened, a photo of the issue, and a photo of the item's white sticker — the sticker carries the numbers that identify the exact part. A complete report starts the replacement immediately.

What you do
  • Three photos and one sentence
  • Within 7 days of delivery for damage
  • One email — a person answers it
Why it matters

A complete report is acted on immediately. An incomplete one waits on missing information — the form asks for exactly what's needed.

Questions at any step

One address reaches a person for anything on this page: customersupport@nobilia-america.com. Every email becomes a ticket with a named owner.